CCNA, CCNA Exam, CCNA help, Cisco Certified Network Associate, CCNA study, CCNA prep

CCNA 2.5: Configure, verify, and troubleshoot interswitch connectivity

Overview:

The CCNA exam covers the following interswitch connectivity topics:

2.5.a Trunk ports
2.5.b Add and remove VLANs on a trunk
2.5.c DTP - Dynamic Trunking Protocol
2.5.d VTP (v1&v2) - VLAN Trunking Protocol
2.5.e 802.1Q
2.5.f Native VLAN


Leave a Reply

s2Member®